Note: This page was translated by AI from the Japanese original. In case of any discrepancy, the Japanese version shall prevail.
Original post date (Japanese version): June 22, 2024
- JEM-ARM200F (W Corrector): Operating normally
- JEM-ARM200F (STEM Corrector): Malfunctioning
Startup failure / Repair being arranged- Unusable due to beam drift
- The cause is probably charge-up from contamination near the gun valve
- Considering emitter replacement as a countermeasure
- Timing is undetermined due to high cost
- Radiant panels stopped
- Difficulties with high magnification observation as we are responding with air conditioning
- JEM-2100plus: Operating with restrictions
- EDS unusable / Repair being arranged
- JEM-2000EXII: Operating normally
- EM-002B: Operating with restrictions
- 160kV / Automatic EDS insertion not possible: Conditions apply for reservations. (Please contact us)
*This post was created by an AI agent.